Power Outage in Ennerdale, Johannesburg
Other outages in this area
Reports from nearby suburbs in the same City Power service area. Not necessarily affecting Ennerdale directly.
Johannesburg Power Outages Today5 active
Updated 3m ago- Update - Fri, 22 May, 08:41Power supply is partially restored following a trip affecting customers in Lenasia Ext 09 and Ext 10. Operators are on site working to restore the remaining customers.source
- Update - Sat, 23 May, 09:57A further fault has been discovered at Nirvana Substation, affecting customers in Lenasia Ext 9 and Ext 10, and material is being ordered for repairs.source
- Update - Sat, 23 May, 18:56Material has been delivered and repairs are underway on the Peri-Urban No 2 Scorpio Distributor at Nirvana Substation, with power still at 95% restoration for customers in Lenasia Ext 09 and Ext 10.source
- Reported - Fri, 22 May, 14:39Operators are currently site investigating the cause of an unplanned power supply interruption affecting customers in Pimville Zone 9, Motswaledi, Chris Hani Baragwanath Hospital, Orlando Flats, Military-Base, Power Park, University of Johannesburg and surrounding areas.source
- Update - Fri, 22 May, 20:25Operators are still on site investigating the cause of the outage affecting customers in Pimville Zone 9, Motswaledi, Chris Hani Baragwanath Hospital, Orlando Flats, Military-Base, Power Park, University of Johannesburg and surrounding areas.source
Report a Power Outage in Ennerdale
Is your power off in Ennerdale? Report it to City Power so they can dispatch a team.
When Will Electricity Come Back in Ennerdale?
How long a power outage in Ennerdale takes to fix depends on what caused it. These are the typical restoration times for the three fault categories City Power handles.
- Unplanned fault
- Most outages in Ennerdale fixed within 4-8 hours. Minor faults (tripped circuit) take 2-4 hours.
- Cable theft
- 12-48 hours to repair, especially if specialised equipment is needed.
- Planned work
- City Power notifies Ennerdale residents in advance. Usually 6-10 hours during the day.
Power Outage History for Ennerdale (Last 90 Days)
City Power reported 10 outages affecting Ennerdale in the last 90 days, totalling 139.2 hours without power. Average restoration time was 27.9 hours. Most faults traced back to the Ennerdale Substation substation (6 of 10). The most common cause was cable fault.
| Date | Duration | Substation | Cause | Also affected |
|---|---|---|---|---|
| 13 May 2026 | - | Ennerdale Substation | stolen cable | - |
| 12 May 2026 | 1.4d | Ennerdale Substation | cable fault | - |
| 07 May 2026 | 5.2h | Ennerdale Substation | stolen electrical equipment | - |
| 05 May 2026 | 2.8d | Ennerdale Substation | cable fault | Denver |
| 30 Apr 2026 | 23.4h | Ennerdale Ext 6 Switching Station | cable fault | Denver |
| 28 Apr 2026 | 9.3h | Ennerdale CBD Switching Station | multiple cable faults | Lawley, Lenasia |
| 27 Apr 2026 | - | Ennerdale Substation | faulty cable | Lawley |
| 24 Apr 2026 | - | Ennerdale CBD Switching Station | trip | Lawley, Lenasia |
| 24 Apr 2026 | - | Ennerdale Substation | - | Lawley, Lenasia |
| 15 Apr 2026 | - | Ennerdale CBD Substation | multiple cable faults | - |
What to Do During a Power Outage in Ennerdale
Quick checklist to follow while waiting for City Power to restore power in Ennerdale.
- Switch off appliances at the wall to prevent damage from power surges when electricity returns.
- Leave one light switched on so you know when power is restored.
- Keep fridges and freezers closed - food stays cold for 4-6 hours if unopened.
- Use battery-powered lights instead of candles to reduce fire risk.
- Report the outage to City Power on 0114907484 / 0860562874 if it has not been reported yet.
Frequently Asked Questions About Power Outages in Ennerdale
Is there a power outage in Ennerdale right now?
No power outage is currently reported by City Power for Ennerdale, Johannesburg. This page updates every 10 minutes with live data from City Power. If your power is off, report it by calling 0114907484 / 0860562874.
How do I report a power outage in Ennerdale?
Call City Power on 0114907484 / 0860562874 to report a power outage in Ennerdale. You can also report online at citypower.co.za or follow @CityPowerJhb on X (Twitter) for updates.
How long do power outages last in Ennerdale?
Most unplanned power outages in Ennerdale are fixed within 4-8 hours. Minor faults like tripped circuits are often restored in 2-4 hours. Major faults from cable theft or equipment damage can take 12-48 hours. Planned maintenance typically lasts 6-10 hours during the day.
When will the electricity be back on in Ennerdale?
City Power has not logged an active electricity outage in Ennerdale right now. If your power is off, the issue may be local to your street or property. Call 0114907484 / 0860562874 or check this page again - it updates every 10 minutes with live electricity restoration data from City Power.
Is it load shedding or a power outage in Ennerdale?
If your power is off outside the load shedding schedule, Ennerdale is experiencing an unplanned power outage - not load shedding. Load shedding follows a fixed timetable, while power outages are caused by faults, cable theft, or equipment failure. Check Ennerdale load shedding schedule
What number do I call for City Power in Ennerdale?
Call City Power on 0114907484 / 0860562874 for power outages in Ennerdale. You can also report faults online at citypower.co.za or WhatsApp the relevant SDC channel for your area.
Related Pages
Click here to join our telegram channel and stay up to date with load shedding and related news!